Integrated systems for TS 58 Belgrade EXPO
We implemented integrated security systems and network infrastructure for the TS 58 substation, integrated with the radio communication system as part of the EXPO infrastructure project.

Project Insights
As part of infrastructure development for the EXPO project in Belgrade, we delivered a project involving the implementation of integrated technical and communication systems for the TS 58 substation. The project plays a key role in ensuring stable and secure operation of the power system in a high-demand environment.
Solution
The project included the implementation of technical security systems, radiocommunication systems, and both active and passive network infrastructure. The integrated solution enables reliable communication, efficient monitoring, and system control, ensuring high levels of security and availability.
All systems were designed to support operational continuity and integration with existing and future energy and communication systems.
Project Summary
The result is a reliable and integrated solution that ensures stable substation operation and supports efficient management of energy infrastructure. The implemented systems contribute to improved safety, reliability, and operational efficiency.