- Telekom Srbija (construction of copper and optical networks)
- ZTE (design and construction of optical networks in urban areas)
- A1 (optical network design)
- EDS (design and construction of optical networks)
- Ministry of Information and Telecommunications (design and construction of optical networks in rural areas)
- Vip Mobile (design, construction, and maintenance of optical networks)
- Huawei (“turnkey” project for FTTx network construction; Safe City project – CCTV implementation in Belgrade)
- Elektrovojvodina (maintenance of optical infrastructure)
- Sattrakt (construction of optical networks)
- PTT (equipment supply – optical amplifiers and nodes)
- Elektrokosmet (equipment supply and optical network construction)
- NOKIA (“turnkey” project for FTTx network construction)
- CCCC (CCTV implementation and optical cable installation on highway projects)
- Strabag (installation of copper and optical cables)
- SMATSA (construction of copper and optical networks)
- Supernova (equipment supply and implementation of HFC and GPON networks)
- MTTT (implementation of telecom infrastructure for the “Schools Connectivity” project)
- CRSC (implementation of telecom infrastructure for modernization of the Belgrade–Stara Pazova railway line)
Projects
Serbia
Bosnia and Herzegovina
- Mtel Banja Luka (design, construction, and maintenance of optical networks)
- Huawei (“turnkey” project, FTTx implementation – Doboj)
- Mtel Banja Luka (“turnkey” project, FTTx implementation – Zvornik area)
- Alumina (optical network implementation)
Montenegro
- Mtel Podgorica (design, implementation, and maintenance of optical networks)
- CEDIS (optical network implementation)
- RDC (optical network implementation)
- Montenegro Airlines (installation of optical cables)
- Krnovo Wind Farm (installation of optical cables)
- Fibercom (supply of optical equipment)
- T-com Montenegro (FTTH design and construction)
- CRBC (Bar–Boljare highway project)
- PS Podvrh (optical fiber installation)
Oman
- OBC (FTTH design and construction)
Austria
- Province of Lower Austria (detailed FTTH network design at the lowest technical level)
Denmark
- Huawei / TDC Telekom (GigaCoax – design, implementation, and modernization of HFC Docsis 3.1 fixed network; Safe City project – CCTV implementation in Belgrade)
Germany
- SPL Tele & Deutsche Telekom – FTTx dislocation projects in Bavaria (network infrastructure replacement)
- EWE AG – optical network dislocation project in Bokel (planning, civil works, telecom works)
- SWN Stadtwerke Neumünster – fiber rollout project in Tellingstedt (civil works, telecom works)
Croatia
- RUNE (FTTH underground and aerial rollout in rural areas)
- Ericsson Nikola Tesla (FTTH underground and aerial network design in rural areas)
- Hrvatski Telekom (FTTH underground and aerial network design)
USA
- Ericsson – optical links construction for RBS
- Verizon – 5G Small Cell rollout (10 sites)
- Okefenokee National Wildlife Refuge – local optical network design
- City of Wausau, WI – local optical network design
- City of Ames, IA – local optical network design
- City of Urbandale, IA – local optical network design
- City of Titletown, WI – local optical network design
Serbia and Region
Telekom Srbija
- Rollout of over 350 GSM/3G/LTE base stations (design, civil works, installation, implementation, troubleshooting)
- Site surveys, technical solutions, main designs – more than 250 GSM/UMTS/LTE BTS sites
- LoRa network – rollout of over 100 base stations
- Base station site design and construction
- 24/7 maintenance
Telenor Serbia
- CW – construction of new BS infrastructure
- Upgrade and rollout of GSM/UMTS/LTE BTS and MW links
VIP mobile Serbia
- Upgrade of more than 300 UMTS/LTE BTS sites
- Design (site construction, technical solutions, statistical calculations, documentation)
ODS
- Antenna tower construction – design, permits, CW
Nokia
- Telekom Srbija (design, installation, implementation, and optimization of over 3,000 GSM/3G/LTE base stations and microwave links, drive tests, and optimization of radio-relay networks)
- VIP Mobile Serbia (design, installation, implementation, and optimization of over 1,600 GSM/3G/LTE base stations and microwave links, drive tests, and RNO)
- m:tel Banja Luka (design, installation, implementation, and optimization of over 800 GSM/3G/LTE base stations and microwave links, drive tests, and RNO)
Ericsson
- Telekom Srbija (design, installation, implementation, and optimization of over 700 GSM/3G base stations and microwave links, drive tests, and RNO)
- VIP Mobile Serbia (design, installation, implementation, and optimization of over 50 MW links)
- m:tel Podgorica (design, installation, implementation, and optimization of over 200 GSM/3G base stations and microwave links, drive tests, and RNO)
- T-HR Telekom Croatia (swap and rollout of GSM/UMTS/LTE BTS sites, civil works, dismantling, installation, implementation)
Huawei
- m:tel Banja Luka (design, installation, implementation, and optimization of over 950 GSM/3G base stations, drive tests, RNO, and OMC services)
- m:tel Banja Luka (design, installation, implementation, and optimization of over 80 MW links, drive tests, RNO, and OMC services)
- Telenor Serbia – BTS swap (Phase I, Belgrade); civil works; dismantling, installation, implementation
- Tus Telekom Slovenia – Telemach (design, installation, implementation, and optimization of over 70 GSM/3G base stations, drive tests, RNO, and OMC services)
- Tele2 Croatia (OMC services for over 850 GSM/3G/LTE sites)
- Telenor Montenegro (design, installation, implementation, and optimization of over 400 GSM/UMTS/LTE BTS sites, drive tests, RNO, OMC services, 24/7 maintenance)
- BH Telekom – ongoing project (design, installation, implementation, and optimization of over 450 GSM/UMTS/LTE BTS sites, drive tests, RNO, OMC services)
Schneider
- EPS Distribution – installation and implementation at over 200 sites (design, installation, and implementation of Trio Q Data Radios; projects in Šabac, Sremska Mitrovica, Valjevo, Ruma, Lazarevac, Zaječar)
- EPS Distribution – installation and implementation at over 700 sites (design, installation, and implementation of Trio Q Data Radios and over 70 microwave links)
Ceragon
- m:tel Banja Luka (design, civil works, dismantling, installation, implementation, troubleshooting of over 150 radio-relay links)
Austria
Nokia – SPL Tele GmBH
- A1 Telekom Austria – swap of more than 3,600 GSM/UMTS/LTE sites (minor and major civil works, dismantling, installation, implementation, and troubleshooting)
- A1 Telekom Austria – modernization of more than 1,300 GSM/UMTS/LTE sites (system module and RF module exchange)
- A1 Telekom Austria – rollout of more than 2,500 GSM/UMTS/LTE sites (civil works, installation, implementation, and troubleshooting)
- A1 Telekom Austria – 5G rollout across more than 120 sites (civil works, installation, implementation, and troubleshooting)
- A1 Telekom Austria – technical documentation for more than 5,000 sites
ZTE – SPL Tele GmBH
- Hutchison Drei Austria GmbH – replacement of 2G/3G/LTE base stations across 1,100 sites (design, civil works, dismantling, installation, implementation, troubleshooting, preventive and corrective maintenance)
- Hutchison Drei Austria GmbH – BBU upgrade project for more than 1,500 sites (upgrade, replacement, and commissioning of BBU units)
Huawei
- T-Mobile Austria – spectrum modernization through re-farming across more than 2,200 GSM/UMTS/LTE sites
- T-Mobile Austria – swap of more than 1,400 3G sites
Kapsch
- Kelag Austria – migration from analog to digital Tetra at 40 sites (analog-to-digital Tetra BS migration)
Germany
Nokia – SPL Tele GmBH
- Telefonica GU7a & GU7a 2020 project – network consolidation, swap and rollout across more than 300 sites (civil works, dismantling, installation, implementation, troubleshooting)
- Deutsche Telekom – SRAN rollout across more than 400 sites
- Telefonica – Abbau project – dismantling across more than 500 sites (civil works, dismantling of telecom equipment)
- DFMG – Deutsche Funkturm GmbH (civil works, dismantling, installation, implementation, troubleshooting)
Ericsson – SPL Tele GmBH
- Deutsche Telekom – SRAN project – modernization across more than 400 sites in the Nuremberg region (civil works, dismantling, installation, implementation, troubleshooting)
Bulgaria
Nokia
- M-Tel Bulgaria – SPRINT Bull Swap and LTE rollout across 200 sites, including SPRINT Carrier Aggregation (200 sites)
USA
Ericsson – T.C.E. LLC
- AT&T FIRSTNET LTE 6C Rollout – more than 150 sites, including power plant swaps (civil works, dismantling, installation, implementation, troubleshooting)
Westchester Engineering Tower Mapping
- AT&T – design of AT&T antenna mounts
PJ Ford – Crown Castle Tower Mapping
- T-Mobile – design of T-Mobile antenna mounts
- T-Mobile/Verizon – Tower Mapping – site surveys and technical documentation for T-Mobile antenna mounts
Fullerton Engineering – American Tower Corporation Tower Mapping
- AT&T – design of AT&T antenna mounts
Destek Engineering LLC – American Tower Corporation Tower Mapping
- AT&T – site surveys and technical documentation for AT&T and T-Mobile antenna mounts
Waterleafe International – FAA – Federal Aviation Administration
- MW links – installation, integration, optimization, troubleshooting
AVIAT Networks – MTSI: First Responders Network
- MW links – installation, integration, optimization, troubleshooting
Crown Castle Tower – T.C.E. LLC: T-Mobile – Lte upgrade and 5G rollout
- Minor and major upgrades of antenna systems across more than 50 sites
- Replacement of power supply units
- Dismantling, installation, implementation, and troubleshooting of new radio and antenna systems
Uniti Towels – T.C.E. LLC
- Raw Land Tower construction
- Civil and electrical services
- Tower erection
- Installation of antennas and antenna systems
Vertical Bridge Towers – T.C.E. LLC
- Raw Land Tower construction
- Civil and electrical services
- Tower erection
- Installation of antennas and antenna systems
Norway
Ericsson
- Telia Norway – RAN network modernization (site surveys, design, civil works, dismantling, installation, BTS swaps, and as-built documentation)
EPS
Huawei
- Delivery, installation, and implementation of DWDM equipment for the national transport network
- 24/7 network management, monitoring, and maintenance services for DWDM transport network
- Technical support for DWDM maintenance
Nokia
- Technical support for SDH transport network maintenance
EMS
Infinera (Coriant), ABB (Keymile)
- Delivery and installation of SDH equipment for the national transport network
- Technical support for SDH equipment maintenance
- Delivery and installation of PDH multiplexer equipment (ongoing project)
- Delivery, installation, and implementation of DWDM equipment nationwide
Wind Farm Projects
Infinera, ABB
- Delivery and installation of SDH and PDH equipment
- Technical support and maintenance of SDH and PDH equipment
Telekom Srbija
Huawei, Infinera, Nokia
- Installation of mini IPAN/MSAN/DSLAM access equipment nationwide
- Installation and commissioning of DWDM equipment for the national transport network
- Technical support for DWDM maintenance
Ministry of Trade, Tourism and Telecommunications
Huawei
- Delivery, installation, and implementation of DWDM equipment for the national transport network
- 24/7 network management, monitoring, and maintenance services for DWDM transport network
- Technical support for DWDM maintenance
mts d.o.o.
Huawei
- Installation and implementation of MSAN/DSLAM/IPAN access equipment
m:tel Banja Luka
Huawei
- Nationwide installation of 1,200 MSAN/DSLAM/IPAN units
- Installation and implementation of DWDM equipment
Nokia
- Nationwide installation of 250 ISAM units
- Delivery, installation, and implementation of DWDM transport network equipment
CGES - Montenegrin Electric Transmission System
Nokia
- Technical support for SDH transport network maintenance
Bosnia and Herzegovina
- Renewal of Non-Directional Beacons (NDB) in Tuzla – with manufacturer Nautel, and in Sarajevo with manufacturer Telerad
- Renewal of VOR and DME systems in cooperation with manufacturer Thales – Banja Luka Airport, Mostar Airport, and Tuzla Airport
- Upgrade and revitalization of MSSR Sarajevo in cooperation with manufacturer Thales
Serbia
- “Milan Blagojević Namenska”, Lučani AD – Video surveillance, Avigilon
- PT “Namenska”, Trstenik – Access control with Gunnebo tripod barriers; video surveillance – Dahua
- MK Fintel Wind, Košava wind farm – Access control, intrusion alarm and perimeter protection – Honeywell + Optex; video surveillance – Avigilon
- Belgrade “Nikola Tesla” Airport – Central monitoring and management system – Schneider Electric
- Brančić Tunnel – Complete security system, Bosch and 2N
- General Electric, Kovačica wind farm – Access control, intrusion alarm and perimeter protection – Honeywell + Optex; video surveillance – Avigilon + Hikvision; Automatic fire detection – Bosch
- Ada Mall – Complete security system, Bosch
- Univerexport – Complete security system, Bosch
- Transformer stations – Fire alarm, CCTV, and intrusion detection
- Novi Pazar Hospital – Design of central monitoring and management system
- Belgrade Central Railway Station (Prokop) – Design and implementation of complete security, fire detection, and integration systems
- Railway Phase 1 – Complete security, fire detection, and integration systems on Belgrade–Budapest railway, section Belgrade–Ruma
- Railway Phase 2 – Complete security, fire detection, and integration systems on Belgrade–Budapest railway, section Ruma–Novi Sad
- Railway Phase 3 – Complete security, fire detection, and integration systems on Belgrade–Budapest railway, section Novi Sad–Subotica
- Railway Expo – Complete security, fire detection, and integration systems on Belgrade–National Stadium railway section (Zemun Polje–National Stadium)
- Palace of Science, Belgrade – Complete security, fire detection, and integration systems
- Merkury Market, Novi Sad – Complete security and fire detection systems
- Epic Games – Complete security, fire detection, and integration systems
- TPS Zemun – Complete security system, public address, gas detection, clock systems, and fire detection
- Delta House Belgrade (SUPREMA) – Complete security, fire detection, public address, and integration systems
- Reconstruction of the Clinic for Neurosurgery, Clinical Center of Serbia – Fire detection, access control, intrusion detection, and system integration
Montenegro
- Hotel Karisma – Complete security system
- Morača Sports Center – Bosch audio system and full security system
- Sava Insurance headquarters, Podgorica – Complete security system
- Military facility Marko Miljanov Popović, KN-18 & KN-19, Podgorica – Complete security systems
- NALL International headquarters, Podgorica – Complete security system
Bosnia and Herzegovina
- Mtel Banja Luka – Video surveillance, Milestone
Serbia
- Sečanj – WWTP: Construction of a wastewater treatment plant in Sečanj to improve the sewage system and enable ecological wastewater treatment, reducing environmental impact.
- Vrdnik – WWTP: Construction of a wastewater treatment plant with a capacity of 15,000 PE (population equivalent), reducing negative environmental impact and preserving the Fruška Gora ecosystem and spa area.
- Zrenjanin – Main Sewer Collector: Construction of a main sewer collector (Ø1300 mm) to connect Zrenjanin to the future WWTP, including a main pumping station and three retention basins for stormwater management.
- Deč – Sewer Network: Construction of a sewage system with PVC pipes (Ø250–300 mm) and four pumping stations, providing long-term wastewater management for households.
- Apatin – WWTP: Construction of a wastewater treatment plant with a capacity of 20,000 PE, applying Design and Build methodology. SBR technology was implemented, combining aeration, sedimentation, and disinfection in a single reactor for high water quality and reduced costs.
- Kalenić Landfill – Environmental remediation project.
- Sremska Mitrovica – Laćarak Sewer Network: Construction of sewage infrastructure in Laćarak as part of a broader expansion and reconstruction project, including one pumping station for system reliability.